Technical Specifications
Certification
CE, RoHS, ISO 9001:2008
Operation Pressure
Atmospheric Pressure
Applicable Medium
Mud, Water, Natural Gas, Crude Oil
Production Capacity
1000 Set/Year
Product Overview
Fracture Fluid Drainage Management System
Developed in collaboration with leading academic institutions, this oilfield fracture fluid management system integrates chemical feeding, desorption, and concentration processes. The system is engineered for rapid deployment, intuitive operation, and cost-effective transportation.
Petroleum exploration and development equipment encompasses a comprehensive range of tools for oil and natural gas exploration, drilling, development, storage, and transportation. This includes geophysical prospecting, logging equipment, oil and gas production units, downhole operation tools, and offshore drilling platform components.
The system is designed to meet the rigorous demands of the process industry, where continuous, stable operation is critical. High automation levels and equipment reliability ensure performance across multiple complex technical links in oil and gas production.
Frequently Asked Questions
What are the primary applications of this management system?
The system is primarily used in drilling rigs for managing various media including mud, water, natural gas, and crude oil during exploration and development processes.
What international standards does the equipment comply with?
The equipment is manufactured to meet API standards and holds certifications including CE, RoHS, and ISO 9001:2008, ensuring global compliance and reliability.
What materials are used in the construction of the system?
The system features a vertical structure constructed from high-grade cast steel, providing the durability required for high-pressure oilfield environments.
How is the equipment packaged for international shipping?
All units are secured in standard export wooden boxes to ensure maximum protection during transit and handling.
What is the typical lead time for a standard order?
The standard lead time for the Fracture Fluid Drainage Management System is approximately 30 days from order confirmation.
Is the system suitable for offshore drilling platforms?
Yes, the design and technical parameters are optimized for both land-based drilling rigs and offshore drilling platform equipment.